The VT Boys have been building a new phone stand for the Nexus 6P as we found a nice design on the internet. The 3D printer was printing the model on the way, we realist that we are running out of printing filement, so we stopped the printer and changed it with another colour, did worked brilliantly so we now know how to print something in two or more colours.
Mr. Mac made lasagna for dinner the day before, because it tastes even better. Mr Gadget love home made lasagna with garlic bread, so does the rest of the family. He even had time to play with his little sister and they had great fun.
Search This Blog
Thursday, 27 April 2017
Sunday, 2 April 2017
The VT Boys and Girls have been playing MineCraft
The VT Boys and Girls have been playing MineCraft this weekend, as Mr Gadget had a sleepover which was very nice for all of us,specifically VT Girl Nr.4 was very happy with that as she was allow to play MineCraft on Mr. Garfields account.
We also upgraded our Intel i7 2600 Windows machine (Hackingtosh) and installed Windows 10 Pro dual boot. The new graphic card is awesome even it is only an NVidia GTX 1050 Ti with 4Gb of DDR5 ram.
VT Girl Nr.4 also has been on the honors board this February as she is been really good for the last 5 weeks at school. See pics below as proof - wow we are really proud.
We also upgraded our Intel i7 2600 Windows machine (Hackingtosh) and installed Windows 10 Pro dual boot. The new graphic card is awesome even it is only an NVidia GTX 1050 Ti with 4Gb of DDR5 ram.
VT Girl Nr.4 also created this from Lego - Airplane Hotel
We had a nice roast for dinner - thanks to VT Girl Nr.1 which we all enjoyed very much. VT Girl Nr 3 came with us to bring Mr.Gadget back home which is also nice for Mr.Mac so he has some company on the way back.VT Girl Nr.4 also has been on the honors board this February as she is been really good for the last 5 weeks at school. See pics below as proof - wow we are really proud.
The VT Boys have been working hard
The VT Boys have been working hard a few weeks ago. Mr.Mac Senior had to build a few new machines for his clients, a couple of workstations, a new HyperV server with two windows 7 pro guests and setup a new Microsoft Surface Book i5.
It was nice to spend some time together - but we have been working really hard to get things ready. To start the day off we had some breakfast at MC Donalds, We started the build the two workstations with Windows 7 Pro, these only took us 1 hour, we then build a Sky Lake i3 workstation and i5 HyperV server with Windows 2012 R2.
We had some lunch and we installed the anniversary edition on the Surface Book of windows 10 - this is a very nice piece of kit, but still way over priced.After helping out in the shop, we closed the office and had some dinner at the Calvary - very nice
Subscribe to:
Posts (Atom)